it’s finally done. the orange works, as i have foreseen. the GORM secondary storage units are fantastic and easy to install. it’s a bit kosong at the mo’ as i need to organise the stuff that’s going in here.

as for the other barang that requires storage that’s currently in the attic, once the garage is done, they’ll be moved there.

the finishing touch to the jamming room is also complete. the only thing left is the painting of the cabs for the electrical/gas meters in the rooms. all i need is the long-awaited drumkit and my friends back from their summer vacation for a jam sesh.

total damage (excluding the TD9KX) comes to about £700, give or take.

click here for a little compare-and-contrast.

[pics taken with the TZ5 at ISO400, no flash]